ITAC Assessment: MS0434
ITAC logo
ITAC Assessment: MS0434
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Armored Vehicle Bumpers
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 100,000
ft2
Annual Production 1,911
units
Production Hrs. Annual 2,125
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,122 668,813
kWh
Electricity Demand $47,834 4,783
kW-mo/yr
Electricity Fees $5,198 -
Natural Gas $34,397 4,912
MMBtu
LPG $7,986 267
MMBtu
Waste Disposal Costs
Water Usage $221 24
Tgal
TOTAL YEARLY COSTS $146,759
RECOMMENDED SAVINGS* $42,735 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.7135: Install occupancy sensors $401 $879 $401
5,007
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $536 $1,765 $506
6,324
kWh
$30
-
kW-mo/yr
-
03 2.1321: Replace fossil fuel equipment with electrical equipment $6,585 $25,000 $(-1,401.6)
(-17,520)
kWh
- $7,986
-
MMBtu
04 2.9114: Use solar heat to make electricty $35,214 $329,875 $35,214
440,179
kWh
- -
TOTAL RECOMMENDED $42,735 $357,519 $34,719
433,990
kWh
$30
-
kW-mo/yr
$7,986
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs