ITAC Assessment: MS0419
ITAC logo
ITAC Assessment: MS0419
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Water Filtration System
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 86
Plant Area 119,000
ft2
Annual Production 4,500,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,935 1,860,200
kWh
Electricity Demand $99,590 7,314
kW-mo/yr
Natural Gas $14,564 1,065
MMBtu
Waste Disposal Costs
Water Usage $665 1,474
Tgal
Water Disposal $665 1,474
Tgal
TOTAL YEARLY COSTS $279,419
RECOMMENDED SAVINGS* $49,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $317 $1,202 $317
3,561
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $256 $1,217 $256
2,883
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $1,886 - $1,723
19,357
kWh
$164
-
kW-mo/yr
04 2.9114: Use solar heat to make electricty $47,025 $389,760 $47,025
528,373
kWh
-
TOTAL RECOMMENDED $49,484 $392,179 $49,321
554,174
kWh
$164
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs