ITAC Assessment: MS0404
ITAC logo
ITAC Assessment: MS0404
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Steel tubing
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 350,000
ft2
Annual Production 18,500,000
lb
Production Hrs. Annual 5,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $728,307 9,577,800
kWh
Electricity Demand $299,493 22,786
kW-mo/yr
Electricity Fees $(-126,867.9) -
Natural Gas $901,571 148,072
MMBtu
Waste Disposal Costs
Water Usage $36,270 11,291
Tgal
TOTAL YEARLY COSTS $1,838,773
RECOMMENDED SAVINGS* $202,018 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $176,387 $1,148,430 $847,835
9,098,910
kWh
- $(-342,446.0) $(-329,002.0)
-
MMBtu
02 2.1121: Use insulation in furnaces to facilitate heating / cooling $9,805 $22,420 - - - $9,805
-
MMBtu
03 2.7233: Use properly designed and sized hvac equipment $853 $525 $761
10,009
kWh
$93
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $14,973 $3,790 - $14,973
-
kW-mo/yr
- -
TOTAL RECOMMENDED $202,018 $1,175,165 $848,596
9,108,919
kWh
$15,066
-
kW-mo/yr
$(-342,446.0) $(-319,197.1)
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs