Assessment Year | 2022 |
---|---|
Principal Product | Steel tubing |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
350,000
ft2
|
Annual Production | 18,500,000
lb
|
Production Hrs. Annual | 5,400
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $728,307 | 9,577,800 |
kWh
|
$0.076 | |
Electricity Demand | $299,493 | 22,786 |
kW-mo/yr
|
$13.14 | |
Electricity Fees | $(-126,867.9) | - |
|
- | |
Natural Gas | $901,571 | 148,072 |
MMBtu
|
$6.09 | |
Waste Disposal Costs | |||||
Water Usage | $36,270 | 11,291 |
Tgal
|
$3.21 | |
TOTAL YEARLY COSTS | $1,838,773 | ||||
RECOMMENDED SAVINGS* | $202,018 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $176,387 | $1,148,430 |
$847,835
9,098,910
kWh
|
- | $(-342,446.0) |
$(-329,002.0)
-
MMBtu
|
|
02 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $9,805 | $22,420 | - | - | - |
$9,805
-
MMBtu
|
|
03 | 2.7233: Use properly designed and sized hvac equipment | $853 | $525 |
$761
10,009
kWh
|
$93
-
kW-mo/yr
|
- | - | |
04 | 2.3212: Optimize plant power factor | $14,973 | $3,790 | - |
$14,973
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $202,018 | $1,175,165 |
$848,596
9,108,919
kWh
|
$15,066
-
kW-mo/yr
|
$(-342,446.0) |
$(-319,197.1)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs