ITAC Assessment: MS0403
ITAC logo
ITAC Assessment: MS0403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Grocery Items
NAICS 445110: Supermarkets and Other Grocery (except Convenience) Stores
SIC 5411: Grocery Stores
Sales Range less than $500
k
# of Employees 40
Plant Area 20,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,706
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,298 915,360
kWh
Electricity Fees $6,461 -
Natural Gas $12,288 1,048
MMBtu
Waste Disposal Costs
Water Usage $1,025 220
Tgal
TOTAL YEARLY COSTS $112,073
RECOMMENDED SAVINGS* $5,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,416

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,116 $2,579 $3,116
31,157
kWh
-
02 2.7132: Install timers on light switches in little used areas $1,349 $105 $1,349
13,492
kWh
-
03 2.7135: Install occupancy sensors $298 $324 $298
2,984
kWh
-
04 2.7232: Replace existing hvac unit with high efficiency model $881 $5,800 $881
8,809
kWh
-
05 2.4321: Upgrade obsolete equipment $300 $3,768 - $300
-
MMBtu
TOTAL RECOMMENDED $5,945 $12,576 $5,644
56,442
kWh
$300
-
MMBtu
TOTAL IMPLEMENTED $3,416 $6,348 $3,116
31,157
kWh
$300
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs