ITAC Assessment: MS0396
ITAC logo
ITAC Assessment: MS0396
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Steel coils
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 9
Plant Area 60,000
ft2
Annual Production 39,298
ton
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,111 421,800
kWh
Electricity Demand $29,142 3,238
kW-mo/yr
Electricity Fees $1,152 -
Natural Gas $6,159 659
MMBtu
TOTAL YEARLY COSTS $69,564
RECOMMENDED SAVINGS* $12,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $9,487 $17,752 - $9,487
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $295 - $295
3,758
kWh
- -
03 2.7221: Lower temperature during the winter season and vice-versa $2,455 - $971
12,367
kWh
$65
-
kW-mo/yr
$1,419
-
MMBtu
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $707 - $707
9,000
kWh
- -
TOTAL RECOMMENDED $12,944 $17,752 $1,973
25,125
kWh
$9,552
-
kW-mo/yr
$1,419
-
MMBtu
TOTAL IMPLEMENTED $2,750 - $1,266
16,125
kWh
$65
-
kW-mo/yr
$1,419
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs