Assessment Year | 2005 |
---|---|
Principal Product | Cement |
NAICS | 327310: Cement Manufacturing |
SIC | 3241: Cement, Hydraulic |
Sales Range | $50 M to 100M |
# of Employees | 93 |
Plant Area |
350,000
ft2
|
Annual Production | 960,000
ton
|
Production Hrs. Annual | 8,232
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,500,000 | 100,000,000 |
kWh
|
$0.025 |
Electricity Demand | $1,000,000 | 252,213 |
kW-mo/yr
|
$3.96 |
Electricity Fees | $500,000 | - |
|
- |
Natural Gas | $329,400 | 48,592 |
MMBtu
|
$6.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,107 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,312 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,870 | $34,746 |
$6,935
462,281
kWh
|
$2,936
-
kW-mo/yr
|
$4,999 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,066 | $392 |
$4,121
274,713
kWh
|
- | $3,945 | - | |
03 | 2.4314: Use synthetic lubricant | $7,356 | $3,025 |
$1,843
122,821
kWh
|
$1,639
-
kW-mo/yr
|
$849 |
$3,025
-
gal
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,972 | $15,438 |
$3,562
237,452
kWh
|
- | $3,410 | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,020 | $9,612 |
$1,410
93,940
kWh
|
$592
-
kW-mo/yr
|
$1,018 | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,823 | $2,271 |
$1,269
84,576
kWh
|
$767
-
kW-mo/yr
|
$787 | - | |
TOTAL RECOMMENDED | $43,107 | $65,484 |
$19,140
1,275,783
kWh
|
$5,934
-
kW-mo/yr
|
$15,008 |
$3,025
-
gal
|
||
TOTAL IMPLEMENTED | $33,312 | $47,775 |
$14,309
953,755
kWh
|
$5,167
-
kW-mo/yr
|
$10,811 |
$3,025
-
gal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs