ITAC Assessment: MS0388
ITAC logo
ITAC Assessment: MS0388
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Concrete
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $1
M
to 5
M
# of Employees 8
Plant Area 100,000
ft2
Annual Production 16,000
units
Production Hrs. Annual 2,860
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,262 57,120
kWh
Electricity Fees $2,018 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $745 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $516

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $516 $142 $516
4,638
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $128 $852 $126
1,153
kWh
$2
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $101 $413 $99
900
kWh
$2
TOTAL RECOMMENDED $745 $1,407 $741
6,691
kWh
$4
TOTAL IMPLEMENTED $516 $142 $516
4,638
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs