ITAC Assessment: CO0468
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product wood roof trusses
NAICS
n/a
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 52,250
ft2
Annual Production 7,200,000
thousand feet
Production Hrs. Annual 4,680
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,548 373,974
kWh
Electricity Demand $11,677 1,130
kW-mo/yr
Electricity Fees $144 -
Natural Gas $10,230 2,138
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7224: Reduce space conditioning during non-working hours $1,550 $1,610 $290
8,792
kWh
- $1,260
-
MMBtu
- - - - - -
02 2.3191: Use demand controller or load shedder $1,170 $1,200 - $1,170
-
kW-mo/yr
- - - - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $570 $310 $520
15,533
kWh
$410
-
kW-mo/yr
- - - $(-360.0) - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $240 $40 $140
4,103
kWh
$100
-
kW-mo/yr
- - - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $90 - $130
3,810
kWh
$100
-
kW-mo/yr
- - - - - $(-140.0) -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $1,770 - - - - $720
-
lb
- - $1,050 - -
07 3.6192: Use a less expensive method of waste removal $200 - - - - - $220
-
lb
- - $(-20.0) -
08 4.111: Add equipment/ operators to reduce production bottleneck $58,970 $60,000 - - - - - $58,970 - - -
09 4.445: Install equipment to move product $5,620 $100 - - - - - $5,620 - - -
10 4.454: Modify startup/shutdown times $3,310 $1,770 - - - - - $70 - - $3,240
TOTAL RECOMMENDED $73,490 $65,030 $1,080
32,238
kWh
$1,780
-
kW-mo/yr
$1,260
-
MMBtu
$720
-
lb
$220
-
lb
$64,300 $1,050 $(-160.0) $3,240
TOTAL IMPLEMENTED $72,080 $63,790 $940
28,135
kWh
$510
-
kW-mo/yr
$1,260
-
MMBtu
$720
-
lb
$220
-
lb
$64,300 $1,050 $(-160.0) $3,240
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs