Assessment Year | 2000 |
---|---|
Principal Product | wood roof trusses |
NAICS |
n/a
|
SIC | 2439: Structural Wood Members, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
52,250
ft2
|
Annual Production | 7,200,000
thousand feet
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $12,548 | 373,974 |
kWh
|
$0.034 |
Electricity Demand | $11,677 | 1,130 |
kW-mo/yr
|
$10.33 |
Electricity Fees | $144 | - |
|
- |
Natural Gas | $10,230 | 2,138 |
MMBtu
|
$4.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,490 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $72,080 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $1,550 | $1,610 |
$290
8,792
kWh
|
- |
$1,260
-
MMBtu
|
- | - | - | - | - | - | |
02 | 2.3191: Use demand controller or load shedder | $1,170 | $1,200 | - |
$1,170
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $570 | $310 |
$520
15,533
kWh
|
$410
-
kW-mo/yr
|
- | - | - | $(-360.0) | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $240 | $40 |
$140
4,103
kWh
|
$100
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $90 | - |
$130
3,810
kWh
|
$100
-
kW-mo/yr
|
- | - | - | - | - | $(-140.0) | - | |
06 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,770 | - | - | - | - |
$720
-
lb
|
- | - | $1,050 | - | - | |
07 | 3.6192: Use a less expensive method of waste removal | $200 | - | - | - | - | - |
$220
-
lb
|
- | - | $(-20.0) | - | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $58,970 | $60,000 | - | - | - | - | - | $58,970 | - | - | - | |
09 | 4.445: Install equipment to move product | $5,620 | $100 | - | - | - | - | - | $5,620 | - | - | - | |
10 | 4.454: Modify startup/shutdown times | $3,310 | $1,770 | - | - | - | - | - | $70 | - | - | $3,240 | |
TOTAL RECOMMENDED | $73,490 | $65,030 |
$1,080
32,238
kWh
|
$1,780
-
kW-mo/yr
|
$1,260
-
MMBtu
|
$720
-
lb
|
$220
-
lb
|
$64,300 | $1,050 | $(-160.0) | $3,240 | ||
TOTAL IMPLEMENTED | $72,080 | $63,790 |
$940
28,135
kWh
|
$510
-
kW-mo/yr
|
$1,260
-
MMBtu
|
$720
-
lb
|
$220
-
lb
|
$64,300 | $1,050 | $(-160.0) | $3,240 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs