ITAC Assessment: MS0373
ITAC logo
ITAC Assessment: MS0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Refrigerators, Freezers
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $100
M
to 500
M
# of Employees 445
Plant Area 286,450
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 6,552
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $390,187 7,967,400
kWh
Electricity Demand $234,913 16,387
kW-mo/yr
Electricity Fees $(-58,239.0) -
Natural Gas $61,942 5,726
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,690 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1331: Burn a less expensive grade of fuel $26,816 $43,705 $9,359
192,926
kWh
$24,883
-
kW-mo/yr
$398 $(-7,824.0)
-
MMBtu
02 2.1331: Burn a less expensive grade of fuel $32,874 $100,490 $9,359
192,926
kWh
$24,883
-
kW-mo/yr
$511 $(-1,879.0)
-
MMBtu
TOTAL RECOMMENDED $59,690 $144,195 $18,718
385,852
kWh
$49,766
-
kW-mo/yr
$909 $(-9,703.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs