Assessment Year | 2020 |
---|---|
Principal Product | Printed objects |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 185 |
Plant Area |
155,000
ft2
|
Annual Production | 40,000,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $231,618 | 3,739,200 |
kWh
|
$0.062 |
Electricity Demand | $21,403 | 8,404 |
kW-mo/yr
|
$2.55 |
Electricity Fees | $8,305 | - |
|
- |
Natural Gas | $18,353 | 2,599 |
MMBtu
|
$7.06 |
TOTAL YEARLY COSTS | $279,679 | |||
RECOMMENDED SAVINGS* | $10,543 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,065 | $40 |
$986
15,895
kWh
|
$79
-
kW-mo/yr
|
- | |
02 | 2.7261: Install timers and/or thermostats | $2,183 | $360 |
$955
15,401
kWh
|
- |
$1,228
-
MMBtu
|
|
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,226 | $270 |
$475
7,658
kWh
|
$751
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,360 | $1,375 |
$1,258
20,801
kWh
|
$102
-
kW-mo/yr
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $122 | $360 |
$122
1,971
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,587 | $20,636 |
$4,217
68,028
kWh
|
$370
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $10,543 | $23,041 |
$8,013
129,754
kWh
|
$1,302
-
kW-mo/yr
|
$1,228
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs