Assessment Year | 2011 |
---|---|
Principal Product | Milk of Magnesia |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $5 M to 10M |
# of Employees | 65 |
Plant Area |
130,000
ft2
|
Annual Production | 9,000,000
units
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $34,542 | 2,223,600 |
kWh
|
$0.016 |
Electricity Demand | $41,746 | 7,292 |
kW-mo/yr
|
$5.72 |
Electricity Fees | $134,113 | - |
|
- |
Natural Gas | $60,253 | 6,724 |
MMBtu
|
$8.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $930 | $386 |
$193
12,477
kWh
|
- | $737 | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,866 | $2,431 |
$268
17,314
kWh
|
$575
-
kW-mo/yr
|
$1,023 | - | |
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $5,839 | $8,380 |
$1,213
78,281
kWh
|
- | $4,626 | - | |
04 | 2.2121: Increase amount of condensate returned | $7,004 | $11,785 | - | - | - |
$7,004
-
MMBtu
|
|
05 | 2.3212: Optimize plant power factor | $6,211 | $30,420 | - | - | $6,211 | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,056 | $11,255 |
$454
29,278
kWh
|
$872
-
kW-mo/yr
|
$1,730 | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,774 | $19,214 |
$564
36,696
kWh
|
$1,059
-
kW-mo/yr
|
$2,151 | - | |
TOTAL RECOMMENDED | $28,680 | $83,871 |
$2,692
174,046
kWh
|
$2,506
-
kW-mo/yr
|
$16,478 |
$7,004
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs