ITAC Assessment: MS0371
ITAC logo
ITAC Assessment: MS0371
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Milk of Magnesia
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 130,000
ft2
Annual Production 9,000,000
units
Production Hrs. Annual 2,210
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,542 2,223,600
kWh
Electricity Demand $41,746 7,292
kW-mo/yr
Electricity Fees $134,113 -
Natural Gas $60,253 6,724
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $930 $386 $193
12,477
kWh
- $737 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,866 $2,431 $268
17,314
kWh
$575
-
kW-mo/yr
$1,023 -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $5,839 $8,380 $1,213
78,281
kWh
- $4,626 -
04 2.2121: Increase amount of condensate returned $7,004 $11,785 - - - $7,004
-
MMBtu
05 2.3212: Optimize plant power factor $6,211 $30,420 - - $6,211 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,056 $11,255 $454
29,278
kWh
$872
-
kW-mo/yr
$1,730 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,774 $19,214 $564
36,696
kWh
$1,059
-
kW-mo/yr
$2,151 -
TOTAL RECOMMENDED $28,680 $83,871 $2,692
174,046
kWh
$2,506
-
kW-mo/yr
$16,478 $7,004
-
MMBtu
TOTAL IMPLEMENTED - - - - - -