ITAC Assessment: MS0357
ITAC logo
ITAC Assessment: MS0357
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product steel
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 336,119
ft2
Annual Production 28,500
ton
Production Hrs. Annual 4,992
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,174 1,794,800
kWh
Electricity Demand $34,904 10,508
kW-mo/yr
Electricity Fees $20,771 -
Natural Gas $19,138 2,119
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,887 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $36,948 $14,221 $21,442
443,883
kWh
$6,485
-
kW-mo/yr
$9,021
02 2.7142: Utilize higher efficiency lamps and/or ballasts $26,909 $70,983 $15,607
323,085
kWh
$4,732
-
kW-mo/yr
$6,570
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,970 $284 $2,970
61,478
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,060 $13,841 $1,195
24,741
kWh
$362
-
kW-mo/yr
$503
TOTAL RECOMMENDED $68,887 $99,329 $41,214
853,187
kWh
$11,579
-
kW-mo/yr
$16,094
TOTAL IMPLEMENTED $5,030 $14,125 $4,165
86,219
kWh
$362
-
kW-mo/yr
$503
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs