ITAC Assessment: MS0347
ITAC logo
ITAC Assessment: MS0347
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Foam Mattresses
NAICS 337910: Mattress Manufacturing
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $5
M
to 10
M
# of Employees 32
Plant Area 78,086
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,405
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,887 291,240
kWh
Electricity Demand $9,777 1,439
kW-mo/yr
Electricity Fees $339 -
Natural Gas $8,323 697
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,223 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,132

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,438 $6,453 $1,620
32,551
kWh
$1,669
-
kW-mo/yr
$149
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $305 $419 $300
6,028
kWh
- $5
03 2.7135: Install occupancy sensors $1,460 $785 $1,438
28,897
kWh
- $22
04 2.7142: Utilize higher efficiency lamps and/or ballasts $827 $4,218 $365
7,323
kWh
$423
-
kW-mo/yr
$39
05 2.4231: Reduce the pressure of compressed air to the minimum required $193 - $49
991
kWh
$141
-
kW-mo/yr
$3
TOTAL RECOMMENDED $6,223 $11,875 $3,772
75,790
kWh
$2,233
-
kW-mo/yr
$218
TOTAL IMPLEMENTED $1,132 $4,637 $665
13,351
kWh
$423
-
kW-mo/yr
$44
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs