ITAC Assessment: MS0346
ITAC logo
ITAC Assessment: MS0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product DOORS
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 240,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,262 3,786,811
kWh
Electricity Demand $125,680 12,889
kW-mo/yr
Electricity Fees $15,764 -
Natural Gas $79,430 8,105
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,601

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $27,889 $39,913 $15,938
250,641
kWh
$11,539
-
kW-mo/yr
$412
02 2.4239: Eliminate or reduce compressed air usage $23,121 $2,882 $22,779
358,231
kWh
- $342
03 2.7135: Install occupancy sensors $9,234 $4,004 $9,098
143,069
kWh
- $136
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,932 $401 $3,873
60,925
kWh
- $59
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,314 $12,874 $1,756
27,613
kWh
$1,509
-
kW-mo/yr
$49
TOTAL RECOMMENDED $67,490 $60,074 $53,444
840,479
kWh
$13,048
-
kW-mo/yr
$998
TOTAL IMPLEMENTED $39,601 $20,161 $37,506
589,838
kWh
$1,509
-
kW-mo/yr
$586
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs