ITAC Assessment: MS0345
ITAC logo
ITAC Assessment: MS0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product LUMBER
NAICS 321114: Wood Preservation
SIC 2491: Wood Preserving
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 367,000
ft2
Annual Production 260,000
thousand feet
Production Hrs. Annual 2,205
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $356,948 5,871,600
kWh
Electricity Demand $107,550 26,647
kW-mo/yr
Electricity Fees $39,382 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,688 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,599

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,308 $7,084 $17,984
295,835
kWh
- $324 -
02 2.2135: Repair and eliminate steam leaks $13,965 $187 - - - $13,965
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,762 $10,935 $4,150
68,272
kWh
$1,510
-
kW-mo/yr
$102 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,977 $4,445 $3,695
60,786
kWh
$1,194
-
kW-mo/yr
$88 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,379 $462 $3,319
54,591
kWh
- $60 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,924 $12,190 $1,387
22,821
kWh
$503
-
kW-mo/yr
$34 -
07 2.7134: Use photocell controls $1,095 $630 $1,076
17,698
kWh
- $19 -
08 2.7135: Install occupancy sensors $948 $864 $931
15,321
kWh
- $17 -
09 2.2136: Install / repair insulation on steam lines $330 $168 - - - $330
-
MMBtu
TOTAL RECOMMENDED $50,688 $36,965 $32,542
535,324
kWh
$3,207
-
kW-mo/yr
$644 $14,295
-
MMBtu
TOTAL IMPLEMENTED $23,599 $6,126 $7,945
130,698
kWh
$1,194
-
kW-mo/yr
$165 $14,295
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs