ITAC Assessment: MS0341
ITAC logo
ITAC Assessment: MS0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Parachutes
NAICS 314999: All Other Miscellaneous Textile Product Mills
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 354
Plant Area 110,000
ft2
Annual Production 45,000
pieces
Production Hrs. Annual 2,205
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,201 1,745,224
kWh
Electricity Demand $13,360 10,969
kW-mo/yr
Electricity Fees $2,952 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,259

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7273: Install desiccant humidity control system $42,353 $102,915 $41,726
374,943
kWh
$627
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $13,482 $217,200 $13,283
170,250
kWh
- $199
03 2.7142: Utilize higher efficiency lamps and/or ballasts $16,112 $38,096 $14,648
187,750
kWh
$1,226
-
kW-mo/yr
$238
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,747 $15,590 $2,497
32,011
kWh
$209
-
kW-mo/yr
$41
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,400 $196 $1,380
17,431
kWh
- $20
TOTAL RECOMMENDED $76,094 $373,997 $73,534
782,385
kWh
$2,062
-
kW-mo/yr
$498
TOTAL IMPLEMENTED $20,259 $53,882 $18,525
237,192
kWh
$1,435
-
kW-mo/yr
$299
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs