ITAC Assessment: MS0336
ITAC logo
ITAC Assessment: MS0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Transformers
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 157,000
ft2
Annual Production 26,400
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,729 13,196,400
kWh
Electricity Demand $162,902 30,449
kW-mo/yr
Electricity Fees $652,334 -
Natural Gas $299,866 38,262
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,985 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,557

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $45,875 $35,094 $38,928
713,660
kWh
$6,270
-
kW-mo/yr
$677
02 2.7135: Install occupancy sensors $7,801 $17,819 $7,686
140,904
kWh
- $115
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,493 $24,911 $6,939
127,205
kWh
$1,428
-
kW-mo/yr
$126
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,881 $391 $1,852
33,972
kWh
- $29
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,935 $2,310 $1,189
21,801
kWh
$717
-
kW-mo/yr
$29
TOTAL RECOMMENDED $65,985 $80,525 $56,594
1,037,542
kWh
$8,415
-
kW-mo/yr
$976
TOTAL IMPLEMENTED $55,557 $53,304 $48,466
888,536
kWh
$6,270
-
kW-mo/yr
$821
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs