ITAC Assessment: MS0334
ITAC logo
ITAC Assessment: MS0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Broadwoven fabric
NAICS 313210: Broadwoven Fabric Mills
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $10
M
to 50
M
# of Employees 235
Plant Area 330,000
ft2
Annual Production 470,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $748,222 15,682,800
kWh
Electricity Demand $365,673 30,478
kW-mo/yr
Natural Gas $350,701 36,932
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,509 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,339

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $43,579 $39,390 $32,533
769,100
kWh
$11,046
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $18,097 $53,432 $12,669
299,501
kWh
$5,428
-
kW-mo/yr
-
03 2.2414: Use waste heat from hot flue gases to preheat $17,689 $11,700 - - $17,689
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,339 $391 $7,339
173,496
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,805 $2,170 $3,138
74,195
kWh
$2,667
-
kW-mo/yr
-
TOTAL RECOMMENDED $92,509 $107,083 $55,679
1,316,292
kWh
$19,141
-
kW-mo/yr
$17,689
-
MMBtu
TOTAL IMPLEMENTED $7,339 $391 $7,339
173,496
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs