| Assessment Year | 1993 |
|---|---|
| Principal Product | Commercial Refrigeration Products |
| NAICS |
n/a
|
| SIC | 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
40,000
ft2
|
| Annual Production | 26,000
pieces
|
| Production Hrs. Annual | 6,257
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $311,950 | 6,259,672 |
kWh
|
$0.050 |
| Natural Gas | $179,747 | 53,543 |
MMBtu
|
$3.36 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $76,817 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,604 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,614 | $2,225 |
$7,614
152,696
kWh
|
- | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $13,006 | $1,690 |
$13,006
260,844
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,990 | $250 |
$4,990
99,941
kWh
|
- | |
| 04 | 2.5194: Redesign process | $50,000 | $145,000 | - | $50,000 | |
| 05 | 2.4323: Use optimum size and capacity equipment | $1,207 | $1,000 |
$1,207
24,326
kWh
|
- | |
| TOTAL RECOMMENDED | $76,817 | $150,165 |
$26,817
537,807
kWh
|
$50,000 | ||
| TOTAL IMPLEMENTED | $12,604 | $2,475 |
$12,604
252,637
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs