Assessment Year | 2008 |
---|---|
Principal Product | Aluminum |
NAICS | 332321: Metal Window and Door Manufacturing |
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $50 M to 100M |
# of Employees | 291 |
Plant Area |
315,000
ft2
|
Annual Production | 250,000,000
lb
|
Production Hrs. Annual | 7,560
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,816,830 | 25,473,096 |
kWh
|
$0.071 |
Electricity Demand | $154,264 | 53,830 |
kW-mo/yr
|
$2.87 |
Electricity Fees | $547,969 | - |
|
- |
Natural Gas | $1,039,874 | 173,745 |
MMBtu
|
$5.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $235,114 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $91,249 | $79,567 |
$82,400
1,118,048
kWh
|
$5,087
-
kW-mo/yr
|
$3,762 | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $81,985 | $18,000 | - | - | - |
$81,985
-
MMBtu
|
|
03 | 2.8114: Change rate schedules or other changes in utility service | $23,107 | - | - | - | $23,107 | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,285 | $401 |
$12,787
173,496
kWh
|
- | $5,498 | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $15,715 | $2,550 |
$9,899
136,163
kWh
|
$954
-
kW-mo/yr
|
$4,862 | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,140 | $9,209 |
$2,740
37,186
kWh
|
$270
-
kW-mo/yr
|
$130 | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,633 | $1,260 |
$1,044
14,171
kWh
|
$95
-
kW-mo/yr
|
$494 | - | |
TOTAL RECOMMENDED | $235,114 | $110,987 |
$108,870
1,479,064
kWh
|
$6,406
-
kW-mo/yr
|
$37,853 |
$81,985
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs