ITAC Assessment: MS0327
ITAC logo
ITAC Assessment: MS0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 38
Plant Area 125,000
ft2
Annual Production 23,400,000
lb
Production Hrs. Annual 8,064
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $777,024 19,087,992
kWh
Electricity Demand $125,226 33,898
kW-mo/yr
Electricity Fees $414,432 -
Natural Gas $889,389 112,537
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,402 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,984

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $41,488 $312 - - - $41,488
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,055 $401 $13,055
319,767
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,964 $28,674 $10,436
259,463
kWh
$1,351
-
kW-mo/yr
$177 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,856 $600 $2,401
59,685
kWh
$414
-
kW-mo/yr
$41 -
05 2.7124: Make a practice of turning off lights when not needed $2,543 $100 $2,219
55,158
kWh
$287
-
kW-mo/yr
$37 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $289 $1,324 $246
6,123
kWh
$39
-
kW-mo/yr
$4 -
07 2.6214: Shut off pilots in standby equipment $207 $24 - - - $207
-
MMBtu
TOTAL RECOMMENDED $72,402 $31,435 $28,357
700,196
kWh
$2,091
-
kW-mo/yr
$259 $41,695
-
MMBtu
TOTAL IMPLEMENTED $41,984 $1,660 $246
6,123
kWh
$39
-
kW-mo/yr
$4 $41,695
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs