ITAC Assessment: MS0321
ITAC logo
ITAC Assessment: MS0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Irrigation Film
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 20,000
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,814 13,301,000
kWh
Electricity Demand $197,452 26,331
kW-mo/yr
Electricity Fees $423,908 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,161 $1,400 $3,765
89,939
kWh
$2,305
-
kW-mo/yr
$91
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,742 $306 $2,703
64,583
kWh
- $39
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,455 $2,724 $1,783
42,605
kWh
$636
-
kW-mo/yr
$36
04 2.2511: Insulate bare equipment $854 $455 $842
20,107
kWh
- $12
TOTAL RECOMMENDED $12,212 $4,885 $9,093
217,234
kWh
$2,941
-
kW-mo/yr
$178
TOTAL IMPLEMENTED $2,742 $306 $2,703
64,583
kWh
- $39
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs