ITAC Assessment: MS0304
ITAC logo
ITAC Assessment: MS0304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Hydraulic Components
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 550
Plant Area 270,000
ft2
Annual Production 18,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $730,653 17,247,384
kWh
Electricity Demand $138,133 37,578
kW-mo/yr
Electricity Fees $717,475 -
Natural Gas $52,574 3,836
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $431,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $431,910

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $289,291 $222,009 $62,777
831,773
kWh
$4,465
-
kW-mo/yr
$222,049
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $118,243 $1,820 $26,061
345,309
kWh
- $92,182
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,366 $16,063 $3,828
50,714
kWh
- $13,538
04 2.4314: Use synthetic lubricant $7,010 $153 $1,484
19,668
kWh
$275
-
kW-mo/yr
$5,251
TOTAL RECOMMENDED $431,910 $240,045 $94,150
1,247,464
kWh
$4,740
-
kW-mo/yr
$333,020
TOTAL IMPLEMENTED $431,910 $240,045 $94,150
1,247,464
kWh
$4,740
-
kW-mo/yr
$333,020
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs