ITAC Assessment: MS0301
ITAC logo
ITAC Assessment: MS0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Aircraft parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 340
Plant Area 400,000
ft2
Annual Production 223,000
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,694 11,755,748
kWh
Electricity Demand $78,216 24,970
kW-mo/yr
Electricity Fees $33,818 -
Natural Gas $1,032,380 117,572
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,586 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,519

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $17,310 $21,720 - - - $17,310
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,625 $30,484 $6,821
495,707
kWh
$4,815
-
kW-mo/yr
$989 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,037 $21,914 $1,441
104,744
kWh
$1,357
-
kW-mo/yr
$239 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,153 $9,150 $1,029
74,785
kWh
$1,124
-
kW-mo/yr
- -
05 3.6124: Burn waste oil for heat $1,477 $2,186 - - - $1,477
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,070 $244 $986
71,683
kWh
- $84 -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $914 $4,882 $842
61,221
kWh
- $72 -
TOTAL RECOMMENDED $38,586 $90,580 $11,119
808,140
kWh
$7,296
-
kW-mo/yr
$1,384 $18,787
-
MMBtu
TOTAL IMPLEMENTED $35,519 $76,548 $9,248
672,134
kWh
$6,172
-
kW-mo/yr
$1,312 $18,787
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs