Assessment Year | 2006 |
---|---|
Principal Product | Aircraft parts |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 340 |
Plant Area |
400,000
ft2
|
Annual Production | 223,000
pieces
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $275,694 | 11,755,748 |
kWh
|
$0.023 |
Electricity Demand | $78,216 | 24,970 |
kW-mo/yr
|
$3.13 |
Electricity Fees | $33,818 | - |
|
- |
Natural Gas | $1,032,380 | 117,572 |
MMBtu
|
$8.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,586 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,519 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $17,310 | $21,720 | - | - | - |
$17,310
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,625 | $30,484 |
$6,821
495,707
kWh
|
$4,815
-
kW-mo/yr
|
$989 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,037 | $21,914 |
$1,441
104,744
kWh
|
$1,357
-
kW-mo/yr
|
$239 | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,153 | $9,150 |
$1,029
74,785
kWh
|
$1,124
-
kW-mo/yr
|
- | - | |
05 | 3.6124: Burn waste oil for heat | $1,477 | $2,186 | - | - | - |
$1,477
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,070 | $244 |
$986
71,683
kWh
|
- | $84 | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $914 | $4,882 |
$842
61,221
kWh
|
- | $72 | - | |
TOTAL RECOMMENDED | $38,586 | $90,580 |
$11,119
808,140
kWh
|
$7,296
-
kW-mo/yr
|
$1,384 |
$18,787
-
MMBtu
|
||
TOTAL IMPLEMENTED | $35,519 | $76,548 |
$9,248
672,134
kWh
|
$6,172
-
kW-mo/yr
|
$1,312 |
$18,787
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs