ITAC Assessment: AM0901
ITAC logo
ITAC Assessment: AM0901
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Elementary School Students
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 66,362
ft2
Annual Production 100
units
Production Hrs. Annual 3,888
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,076 874,435
kWh
Electricity Demand $50,646 3,831
kW-mo/yr
Natural Gas $15,152 1,464
MMBtu
TOTAL YEARLY COSTS $102,874
RECOMMENDED SAVINGS* $37,149 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $16,101 $4,000 $10,471
246,962
kWh
- $5,630
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,599 $3,000 $845
19,933
kWh
$754
-
kW-mo/yr
-
03 2.9114: Use solar heat to make electricty $16,877 $327,235 $12,488
294,529
kWh
$4,389
-
kW-mo/yr
-
04 2.5123: Reduce fluid flow rates $2,572 $3,000 $2,572
60,699
kWh
- -
TOTAL RECOMMENDED $37,149 $337,235 $26,376
622,123
kWh
$5,143
-
kW-mo/yr
$5,630
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs