ITAC Assessment: MS0298
ITAC logo
ITAC Assessment: MS0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Steer Axles
NAICS 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $100
M
to 500
M
# of Employees 548
Plant Area 300,000
ft2
Annual Production 168,066
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,098,076 30,193,200
kWh
Electricity Demand $202,364 49,499
kW-mo/yr
Electricity Fees $44,547 -
Natural Gas $1,027,346 77,429
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,532

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $33,600 $53,730 $28,762
782,506
kWh
$4,500
-
kW-mo/yr
$338 -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,377 $17,617 $5,323
144,815
kWh
- $54 -
03 2.2442: Preheat combustion air with waste heat $3,854 $1,700 - - - $3,854
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,964 $236 $1,945
52,910
kWh
- $19 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,852 $2,775 $1,612
43,866
kWh
$221
-
kW-mo/yr
$19 -
06 2.4221: Install compressor air intakes in coolest locations $1,739 $1,313 $1,407
38,267
kWh
$315
-
kW-mo/yr
$17 -
TOTAL RECOMMENDED $48,386 $77,371 $39,049
1,062,364
kWh
$5,036
-
kW-mo/yr
$447 $3,854
-
MMBtu
TOTAL IMPLEMENTED $44,532 $75,671 $39,049
1,062,364
kWh
$5,036
-
kW-mo/yr
$447 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs