Assessment Year | 2006 |
---|---|
Principal Product | Steer Axles |
NAICS | 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
Sales Range | $100 M to 500M |
# of Employees | 548 |
Plant Area |
300,000
ft2
|
Annual Production | 168,066
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,098,076 | 30,193,200 |
kWh
|
$0.036 |
Electricity Demand | $202,364 | 49,499 |
kW-mo/yr
|
$4.09 |
Electricity Fees | $44,547 | - |
|
- |
Natural Gas | $1,027,346 | 77,429 |
MMBtu
|
$13.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,386 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,532 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $33,600 | $53,730 |
$28,762
782,506
kWh
|
$4,500
-
kW-mo/yr
|
$338 | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,377 | $17,617 |
$5,323
144,815
kWh
|
- | $54 | - | |
03 | 2.2442: Preheat combustion air with waste heat | $3,854 | $1,700 | - | - | - |
$3,854
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,964 | $236 |
$1,945
52,910
kWh
|
- | $19 | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,852 | $2,775 |
$1,612
43,866
kWh
|
$221
-
kW-mo/yr
|
$19 | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,739 | $1,313 |
$1,407
38,267
kWh
|
$315
-
kW-mo/yr
|
$17 | - | |
TOTAL RECOMMENDED | $48,386 | $77,371 |
$39,049
1,062,364
kWh
|
$5,036
-
kW-mo/yr
|
$447 |
$3,854
-
MMBtu
|
||
TOTAL IMPLEMENTED | $44,532 | $75,671 |
$39,049
1,062,364
kWh
|
$5,036
-
kW-mo/yr
|
$447 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs