ITAC Assessment: MS0297
ITAC logo
ITAC Assessment: MS0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Burial Caskets
NAICS 339995: Burial Casket Manufacturing
SIC 3995: Burial Caskets
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 650,000
ft2
Annual Production 155,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $466,838 11,392,920
kWh
Electricity Demand $72,863 20,966
kW-mo/yr
Electricity Fees $425,483 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,791 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,825

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $45,413 $160,000 $30,849
573,255
kWh
$6,552
-
kW-mo/yr
$8,012
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,548 $26,994 $9,366
174,043
kWh
$1,792
-
kW-mo/yr
$2,390
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,825 $225 $1,502
27,918
kWh
- $323
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,005 $7,451 $488
11,152
kWh
$228
-
kW-mo/yr
$289
TOTAL RECOMMENDED $61,791 $194,670 $42,205
786,368
kWh
$8,572
-
kW-mo/yr
$11,014
TOTAL IMPLEMENTED $1,825 $225 $1,502
27,918
kWh
- $323
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs