Assessment Year | 2006 |
---|---|
Principal Product | PVC resin and compound |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $100 M to 500M |
# of Employees | 174 |
Plant Area |
1,089,000
ft2
|
Annual Production | 1,220,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $3,015,166 | 114,369,401 |
kWh
|
$0.026 |
Electricity Demand | $1,656,077 | 173,593 |
kW-mo/yr
|
$9.54 |
Electricity Fees | $239,433 | - |
|
- |
Natural Gas | $11,802,202 | 1,263,236 |
MMBtu
|
$9.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $154,955 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $95,001 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $57,344 | $3,269 |
$56,496
2,140,000
kWh
|
- | $848 | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $44,954 | $113,910 |
$44,289
1,677,626
kWh
|
- | $665 | - | |
03 | 2.2135: Repair and eliminate steam leaks | $33,575 | $374 | - | - | - |
$33,575
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,105 | $51,885 |
$7,967
301,785
kWh
|
$3,959
-
kW-mo/yr
|
$179 | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,082 | $6,420 |
$2,352
89,100
kWh
|
$1,670
-
kW-mo/yr
|
$60 | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,895 | $12,886 |
$1,631
61,799
kWh
|
$1,221
-
kW-mo/yr
|
$43 | - | |
TOTAL RECOMMENDED | $154,955 | $188,744 |
$112,735
4,270,310
kWh
|
$6,850
-
kW-mo/yr
|
$1,795 |
$33,575
-
MMBtu
|
||
TOTAL IMPLEMENTED | $95,001 | $10,063 |
$58,848
2,229,100
kWh
|
$1,670
-
kW-mo/yr
|
$908 |
$33,575
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs