ITAC Assessment: MS0289
ITAC logo
ITAC Assessment: MS0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product small gasoline engines
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 278
Plant Area 186,277
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $207,228 7,025,338
kWh
Electricity Demand $127,248 15,647
kW-mo/yr
Electricity Fees $27,323 -
Natural Gas $117,309 13,504
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,615 $42,772 $10,430
298,773
kWh
$7,736
-
kW-mo/yr
$(-2,551.0)
02 2.7111: Reduce illumination to minimum necessary levels $5,962 $54 $3,979
114,000
kWh
$2,956
-
kW-mo/yr
$(-973.0)
03 2.7124: Make a practice of turning off lights when not needed $1,395 $100 $932
26,710
kWh
$691
-
kW-mo/yr
$(-228.0)
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,133 $2,724 $1,321
37,844
kWh
- $(-188.0)
05 2.4221: Install compressor air intakes in coolest locations $904 $148 $469
13,427
kWh
$583
-
kW-mo/yr
$(-148.0)
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $743 $2,475 $432
12,377
kWh
$432
-
kW-mo/yr
$(-121.0)
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,245 $223 $1,453
41,617
kWh
- $(-208.0)
TOTAL RECOMMENDED $26,997 $48,496 $19,016
544,748
kWh
$12,398
-
kW-mo/yr
$(-4,417.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs