ITAC Assessment: MS0287
ITAC logo
ITAC Assessment: MS0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Fasteners
NAICS 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 325,000
ft2
Annual Production 48,800,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $455,669 10,178,784
kWh
Electricity Demand $55,809 14,529
kW-mo/yr
Electricity Fees $226,220 -
Natural Gas $36,792 3,142
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,328 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $30,298 $78,252 $16,291
488,814
kWh
$3,689
-
kW-mo/yr
$10,318
02 2.7111: Reduce illumination to minimum necessary levels $17,250 $41 $9,119
273,600
kWh
$2,300
-
kW-mo/yr
$5,831
03 4.512: Condense operation into one building $9,134 $100 $4,020
120,635
kWh
$2,247
-
kW-mo/yr
$2,867
04 2.7124: Make a practice of turning off lights when not needed $8,563 $4,617 $5,401
163,839
kWh
- $3,162
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,562 $16,090 $5,422
162,674
kWh
- $3,140
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,494 $3,825 $2,212
66,378
kWh
- $1,282
07 2.7224: Reduce space conditioning during non-working hours $2,437 $1,550 $1,543
46,308
kWh
- $894
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,052 $213 $1,299
38,979
kWh
- $753
09 2.7229: Air condition only space necessary $538 $400 $180
5,400
kWh
$203
-
kW-mo/yr
$155
TOTAL RECOMMENDED $82,328 $105,088 $45,487
1,366,627
kWh
$8,439
-
kW-mo/yr
$28,402
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs