ITAC Assessment: MS0269
ITAC logo
ITAC Assessment: MS0269
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product printers
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 650,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,824 7,180,000
kWh
Electricity Demand $167,194 15,094
kW-mo/yr
Electricity Fees $30,871 -
Natural Gas $7,506 617
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $332,424 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $331,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7124: Make a practice of turning off lights when not needed $126,283 $13,608 $118,022
3,109,930
kWh
- $8,261
02 2.7142: Utilize higher efficiency lamps and/or ballasts $61,735 $79,029 $40,520
1,067,726
kWh
$17,176
-
kW-mo/yr
$4,039
03 2.7111: Reduce illumination to minimum necessary levels $61,542 $1,920 $40,399
1,064,540
kWh
$17,117
-
kW-mo/yr
$4,026
04 2.7226: Use computer programs to optimize hvac performance $38,704 $8,800 $36,172
953,148
kWh
- $2,532
05 2.8121: Apply for tax-free status for energy purchases $24,256 $50 - - $24,256
06 2.7124: Make a practice of turning off lights when not needed $11,055 - $10,332
272,256
kWh
- $723
07 3.1191: Change procedures / equipment / operating conditions $8,354 - - $7,807
-
kW-mo/yr
$547
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $495 $180 $463
12,200
kWh
- $32
TOTAL RECOMMENDED $332,424 $103,587 $245,908
6,479,800
kWh
$42,100
-
kW-mo/yr
$44,416
TOTAL IMPLEMENTED $331,929 $103,407 $245,445
6,467,600
kWh
$42,100
-
kW-mo/yr
$44,384
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs