Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Vinly Flooring Tile
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3996: Linoleum, Asphalted-Felt-Base, and Other Hard Surface Floor Coverings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 138
Plant Area 300,000
ft2
Annual Production 140,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $732,252 17,941,770
kWh
Electricity Demand $119,702 32,312
kW-mo/yr
Electricity Fees $370,644 -
Natural Gas $508,485 71,682
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,877 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,099 $44,786 $14,364
430,996
kWh
- $8,735 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,715 $26,992 $5,384
161,552
kWh
$868
-
kW-mo/yr
$3,463 - -
03 2.7124: Make a practice of turning off lights when not needed $8,274 $180 $4,642
139,275
kWh
$665
-
kW-mo/yr
$2,967 - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,048 $5,265 $4,459
133,791
kWh
$721
-
kW-mo/yr
$2,868 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,966 $509 $4,953
148,627
kWh
- $3,013 - -
06 2.2135: Repair and eliminate steam leaks $7,305 $19 - - - $7,305
-
MMBtu
-
07 2.8114: Change rate schedules or other changes in utility service $4,446 - - - $4,446 - -
08 2.2136: Install / repair insulation on steam lines $1,892 $939 - - - $1,892
-
MMBtu
-
09 2.8114: Change rate schedules or other changes in utility service $132 - - - - - $132
-
Tgal
TOTAL RECOMMENDED $70,877 $78,690 $33,802
1,014,241
kWh
$2,254
-
kW-mo/yr
$25,492 $9,197
-
MMBtu
$132
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs