ITAC Assessment: MS0261
ITAC logo
ITAC Assessment: MS0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Cardboard Boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 250,000
ft2
Annual Production 700,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,849 5,500,500
kWh
Electricity Demand $41,389 12,773
kW-mo/yr
Electricity Fees $95,035 -
Natural Gas $319,960 45,973
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,624 $25,372 $12,698
308,268
kWh
$1,895
-
kW-mo/yr
$9,031 -
02 2.2414: Use waste heat from hot flue gases to preheat $15,290 $15,000 - - - $15,290
-
MMBtu
03 2.7231: Use radiant heater for spot heating $6,881 $3,275 - - - $6,881
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $4,978 $2,968 $2,966
72,002
kWh
- $2,012 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,530 $1,992 $1,894
45,992
kWh
$288
-
kW-mo/yr
$1,348 -
06 2.6218: Turn off equipment when not in use $1,883 - $1,122
27,232
kWh
- $761 -
07 2.2135: Repair and eliminate steam leaks $1,491 $19 - - - $1,491
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,148 $3,031 $617
14,976
kWh
$93
-
kW-mo/yr
$438 -
09 2.7132: Install timers on light switches in little used areas $881 $66 $432
10,483
kWh
$128
-
kW-mo/yr
$321 -
TOTAL RECOMMENDED $59,706 $51,723 $19,729
478,953
kWh
$2,404
-
kW-mo/yr
$13,911 $23,662
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs