| Assessment Year | 2001 |
|---|---|
| Principal Product | Wood and laminate cabinet doors and drawer fronts |
| NAICS |
n/a
|
| SIC | 2431: Millwork |
| Sales Range | $50 M to 100M |
| # of Employees | 750 |
| Plant Area |
170,000
ft2
|
| Annual Production | 3,374,800
pieces
|
| Production Hrs. Annual | 4,376
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $245,842 | 6,914,358 |
kWh
|
$0.036 |
| Electricity Demand | $140,679 | 18,506 |
kW-mo/yr
|
$7.60 |
| Electricity Fees | $164 | - |
|
- |
| Natural Gas | $25,950 | 5,139 |
MMBtu
|
$5.05 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,550 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,510 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,760 | $50 |
$3,960
141,300
kWh
|
$4,800
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,830 | $100 |
$2,830
101,000
kWh
|
- | - | - | - | |
| 03 | 2.6218: Turn off equipment when not in use | $2,240 | - |
$2,240
80,300
kWh
|
- | - | - | - | |
| 04 | 2.8121: Apply for tax-free status for energy purchases | $1,980 | $3,960 | - | - | - | - | $1,980 | |
| 05 | 2.2437: Recover waste heat from equipment | $1,460 | $500 | - | - |
$1,460
-
MMBtu
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $860 | $540 |
$100
3,440
kWh
|
$60
-
kW-mo/yr
|
- | $700 | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $850 | $1,910 |
$230
8,280
kWh
|
$620
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.4314: Use synthetic lubricant | $390 | - |
$290
10,300
kWh
|
$100
-
kW-mo/yr
|
- | - | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $180 | $280 |
$80
2,760
kWh
|
$100
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $19,550 | $7,340 |
$9,730
347,380
kWh
|
$5,680
-
kW-mo/yr
|
$1,460
-
MMBtu
|
$700 | $1,980 | ||
| TOTAL IMPLEMENTED | $8,510 | $4,560 |
$5,070
181,300
kWh
|
- |
$1,460
-
MMBtu
|
- | $1,980 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs