ITAC Assessment: MS0248
ITAC logo
ITAC Assessment: MS0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Coaxial Cable
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 77
Plant Area 178,000
ft2
Annual Production 154,900,000
thousand feet
Production Hrs. Annual 5,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,083 5,391,412
kWh
Electricity Demand $54,248 13,699
kW-mo/yr
Electricity Fees $67,875 -
Natural Gas $14,386 1,364
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,051 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $6,530 $120 n/a $4,323
98,890
kWh
$690
-
kW-mo/yr
$1,517 - -
02 2.7229: Air condition only space necessary $4,615 $2,282 n/a $3,503
80,138
kWh
- $1,112 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,390 $9,688 n/a $2,798
64,012
kWh
$581
-
kW-mo/yr
$1,011 - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,247 $4,074 n/a $2,120
48,499
kWh
$375
-
kW-mo/yr
$752 - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,960 $8,090 n/a $1,961
44,851
kWh
$312
-
kW-mo/yr
$687 - -
06 3.6124: Burn waste oil for heat $2,232 $2,190 n/a - - - $2,232
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,777 $228 n/a $1,348
23,733
kWh
- $429 - -
08 4.812: Apply for investment incentives $740 $25 n/a - - - - $740
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $560 $1,033 n/a $425
9,731
kWh
- $135 - -
TOTAL RECOMMENDED $27,051 $27,730 $16,478
369,854
kWh
$1,958
-
kW-mo/yr
$5,643 $2,232
-
MMBtu
$740
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs