ITAC Assessment: MS0221
ITAC logo
ITAC Assessment: MS0221
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Heat Exchangers
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $100
M
to 500
M
# of Employees 1,293
Plant Area 800,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $985,795 28,690,200
kWh
Electricity Demand $451,127 76,961
kW-mo/yr
Electricity Fees $205,395 -
Natural Gas $788,050 148,694
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $224,316 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $211,784

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $202,950 $8,100 - - - $202,950
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,072 $12,006 $10,203
296,953
kWh
- $1,869 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,834 $782 $7,466
217,290
kWh
- $1,368 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $460 $585 $302
8,777
kWh
$91
-
kW-mo/yr
$67 -
TOTAL RECOMMENDED $224,316 $21,473 $17,971
523,020
kWh
$91
-
kW-mo/yr
$3,304 $202,950
TOTAL IMPLEMENTED $211,784 $8,882 $7,466
217,290
kWh
- $1,368 $202,950
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs