ITAC Assessment: MS0218
ITAC logo
ITAC Assessment: MS0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Pharmaceuticals
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $1
M
to 5
M
# of Employees 375
Plant Area 256,000
ft2
Annual Production 382,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $495,419 14,946,000
kWh
Electricity Demand $256,021 26,496
kW-mo/yr
Electricity Fees $11,272 -
Natural Gas $294,384 70,799
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,390

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $11,278 $10,000 - - - $11,278
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,569 - $3,811
122,379
kWh
$5,617
-
kW-mo/yr
$141 -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,686 - - $8,556
-
kW-mo/yr
$130 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,012 $284 $7,896
253,505
kWh
- $116 -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,933 $1,200 $1,345
43,200
kWh
$5,486
-
kW-mo/yr
$102 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,718 - $3,661
117,623
kWh
- $57 -
07 2.7122: Disconnect ballasts $2,405 $1,230 $1,616
51,906
kWh
$753
-
kW-mo/yr
$36 -
TOTAL RECOMMENDED $50,601 $12,714 $18,329
588,613
kWh
$20,412
-
kW-mo/yr
$582 $11,278
-
MMBtu
TOTAL IMPLEMENTED $32,390 $1,514 $16,984
545,413
kWh
$14,926
-
kW-mo/yr
$480 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs