ITAC Assessment: MS0192
ITAC logo
ITAC Assessment: MS0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Window balances
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 105,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,574 3,004,200
kWh
Electricity Demand $24,600 9,040
kW-mo/yr
Electricity Fees $16,628 -
Natural Gas $27,326 2,915
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,617

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,415 $443 $3,478
72,816
kWh
- $937 -
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,993 $1,000 - - - $3,993
-
MMBtu
03 2.8114: Change rate schedules or other changes in utility service $5,056 $50 - - - $5,056
-
MMBtu
04 2.2442: Preheat combustion air with waste heat $13,924 $510 - - - $13,924
-
MMBtu
05 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $1,153 $3,127 $879
18,426
kWh
$36
-
kW-mo/yr
$238 -
TOTAL RECOMMENDED $28,541 $5,130 $4,357
91,242
kWh
$36
-
kW-mo/yr
$1,175 $22,973
-
MMBtu
TOTAL IMPLEMENTED $14,617 $4,620 $4,357
91,242
kWh
$36
-
kW-mo/yr
$1,175 $9,049
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs