Assessment Year | 2001 |
---|---|
Principal Product | Drinking water filtration systems |
NAICS |
n/a
|
SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
105,000
ft2
|
Annual Production | 400,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $125,981 | 3,610,800 |
kWh
|
$0.035 |
Electricity Demand | $86,843 | 9,180 |
kW-mo/yr
|
$9.46 |
Electricity Fees | $(-31,904.0) | - |
|
- |
Natural Gas | $4,593 | 587 |
MMBtu
|
$7.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,265 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $8,911 | $6,300 | n/a |
$3,899
111,720
kWh
|
$4,881
-
kW-mo/yr
|
$131 | - |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $586 | $302 | n/a |
$578
16,560
kWh
|
- | $8 | - |
03 | 2.3212: Optimize plant power factor | $9,338 | $9,000 | n/a | - | - | $9,338 | - |
04 | 2.2511: Insulate bare equipment | $436 | $488 | n/a |
$430
12,313
kWh
|
- | $6 | - |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,525 | $5,299 | n/a |
$1,246
35,709
kWh
|
$1,242
-
kW-mo/yr
|
$37 | - |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,862 | $55,237 | n/a |
$9,642
276,345
kWh
|
$7,956
-
kW-mo/yr
|
$264 | - |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,869 | $96,000 | n/a |
$16,853
483,034
kWh
|
$752
-
kW-mo/yr
|
$264 | - |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $8,738 | $2,250 | n/a | - | - | - |
$8,738
-
lb
|
TOTAL RECOMMENDED | $66,265 | $174,876 |
$32,648
935,681
kWh
|
$14,831
-
kW-mo/yr
|
$10,048 |
$8,738
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs