ITAC Assessment: MS0190
ITAC logo
ITAC Assessment: MS0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Drinking water filtration systems
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 105,000
ft2
Annual Production 400,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,981 3,610,800
kWh
Electricity Demand $86,843 9,180
kW-mo/yr
Electricity Fees $(-31,904.0) -
Natural Gas $4,593 587
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,265 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.7111: Reduce illumination to minimum necessary levels $8,911 $6,300 n/a $3,899
111,720
kWh
$4,881
-
kW-mo/yr
$131 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $586 $302 n/a $578
16,560
kWh
- $8 -
03 2.3212: Optimize plant power factor $9,338 $9,000 n/a - - $9,338 -
04 2.2511: Insulate bare equipment $436 $488 n/a $430
12,313
kWh
- $6 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,525 $5,299 n/a $1,246
35,709
kWh
$1,242
-
kW-mo/yr
$37 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $17,862 $55,237 n/a $9,642
276,345
kWh
$7,956
-
kW-mo/yr
$264 -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,869 $96,000 n/a $16,853
483,034
kWh
$752
-
kW-mo/yr
$264 -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $8,738 $2,250 n/a - - - $8,738
-
lb
TOTAL RECOMMENDED $66,265 $174,876 $32,648
935,681
kWh
$14,831
-
kW-mo/yr
$10,048 $8,738
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs