Assessment Year | 2001 |
---|---|
Principal Product | plastic spools |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 53 |
Plant Area |
40,000
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,971 | 2,345,400 |
kWh
|
$0.036 |
Electricity Demand | $35,326 | 4,762 |
kW-mo/yr
|
$7.42 |
Electricity Fees | $9,216 | - |
|
- |
Natural Gas | $5,397 | 763 |
MMBtu
|
$7.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,634 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $7,319 | $6,300 | - | - | $7,319 | - | - | |
02 | 2.7134: Use photocell controls | $243 | $148 |
$240
7,237
kWh
|
- | $3 | - | - | |
03 | 2.6214: Shut off pilots in standby equipment | $159 | $60 | - | - | - |
$159
-
MMBtu
|
- | |
04 | 2.2437: Recover waste heat from equipment | $2,584 | $3,339 | - | - | - |
$2,584
-
MMBtu
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $24,750 | $68,250 |
$18,712
564,635
kWh
|
$5,672
-
kW-mo/yr
|
$366 | - | - | |
06 | 2.2511: Insulate bare equipment | $368 | $156 |
$363
10,950
kWh
|
- | $5 | - | - | |
07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $211 | - | - | - | - | - |
$211
-
lb
|
|
TOTAL RECOMMENDED | $35,634 | $78,253 |
$19,315
582,822
kWh
|
$5,672
-
kW-mo/yr
|
$7,693 |
$2,743
-
MMBtu
|
$211
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs