ITAC Assessment: MS0174
ITAC logo
ITAC Assessment: MS0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product plastic spools
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 53
Plant Area 40,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,971 2,345,400
kWh
Electricity Demand $35,326 4,762
kW-mo/yr
Electricity Fees $9,216 -
Natural Gas $5,397 763
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3212: Optimize plant power factor $7,319 $6,300 - - $7,319 - -
02 2.7134: Use photocell controls $243 $148 $240
7,237
kWh
- $3 - -
03 2.6214: Shut off pilots in standby equipment $159 $60 - - - $159
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $2,584 $3,339 - - - $2,584
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,750 $68,250 $18,712
564,635
kWh
$5,672
-
kW-mo/yr
$366 - -
06 2.2511: Insulate bare equipment $368 $156 $363
10,950
kWh
- $5 - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $211 - - - - - $211
-
lb
TOTAL RECOMMENDED $35,634 $78,253 $19,315
582,822
kWh
$5,672
-
kW-mo/yr
$7,693 $2,743
-
MMBtu
$211
-
lb
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs