ITAC Assessment: MS0167
ITAC logo
ITAC Assessment: MS0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Upholstered Household Furniture
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 370
Plant Area 337,000
ft2
Annual Production 114,000
pieces
Production Hrs. Annual 2,150
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,050 1,961,606
kWh
Electricity Demand $78,318 10,279
kW-mo/yr
Electricity Fees $5,177 -
Natural Gas $56,716 8,597
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,084

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2442: Preheat combustion air with waste heat $6,673 $3,114 - - - $6,673
-
MMBtu
02 2.4222: Install adequate dryers on air lines to eliminate blowdown $4,379 $11,435 $4,314
122,802
kWh
- $65 -
03 2.4221: Install compressor air intakes in coolest locations $1,327 $151 $439
12,603
kWh
$868
-
kW-mo/yr
$20 -
04 2.3212: Optimize plant power factor $1,698 $1,845 - - $1,698 -
05 2.6214: Shut off pilots in standby equipment $757 $217 - - - $757
-
MMBtu
TOTAL RECOMMENDED $14,834 $16,762 $4,753
135,405
kWh
$868
-
kW-mo/yr
$1,783 $7,430
-
MMBtu
TOTAL IMPLEMENTED $2,084 $368 $439
12,603
kWh
$868
-
kW-mo/yr
$20 $757
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs