Assessment Year | 1999 |
---|---|
Principal Product | Steel Brads and Staples |
NAICS |
n/a
|
SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
Sales Range | $10 M to 50M |
# of Employees | 154 |
Plant Area |
132,000
ft2
|
Annual Production | 1,800,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $274,156 | 7,801,876 |
kWh
|
$0.035 |
Electricity Demand | $208,974 | 19,968 |
kW-mo/yr
|
$10.47 |
Electricity Fees | $10,901 | - |
|
- |
Natural Gas | $22,936 | 3,354 |
MMBtu
|
$6.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,973 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,213 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $15,658 | $1,110 |
$15,427
439,039
kWh
|
- | $231 | - | - | |
02 | 2.7261: Install timers and/or thermostats | $1,258 | $708 |
$1,239
35,170
kWh
|
- | $19 | - | - | |
03 | 2.7135: Install occupancy sensors | $1,733 | $798 |
$1,188
33,705
kWh
|
$519
-
kW-mo/yr
|
$26 | - | - | |
04 | 2.6214: Shut off pilots in standby equipment | $1,128 | $20 | - | - | - |
$1,128
-
MMBtu
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,027 | $1,391 |
$4,655
155,920
kWh
|
$5,194
-
kW-mo/yr
|
$148 |
$(-4,970.0)
-
MMBtu
|
- | |
06 | 3.3131: Use evaporation to concentrate material | $12,169 | $24,480 | - | - | - |
$(-860.0)
-
MMBtu
|
$13,029
-
gal
|
|
07 | 4.821: Pay bills on time to avoid late fees | - | - | - | - | - | - | - | |
TOTAL RECOMMENDED | $36,973 | $28,507 |
$22,509
663,834
kWh
|
$5,713
-
kW-mo/yr
|
$424 |
$(-4,702.0)
-
MMBtu
|
$13,029
-
gal
|
||
TOTAL IMPLEMENTED | $30,213 | $26,318 |
$16,666
474,209
kWh
|
- | $250 |
$268
-
MMBtu
|
$13,029
-
gal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs