ITAC Assessment: MS0142
ITAC logo
ITAC Assessment: MS0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Injection Molded Plastic Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 30,000
ft2
Annual Production 18,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $457,607 8,864,889
kWh
Electricity Demand $58,179 22,223
kW-mo/yr
Electricity Fees $(-79,673.0) -
Natural Gas $1,349 268
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,782 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.7134: Use photocell controls $1,213 $777 $1,508
29,601
kWh
- $(-295.0) -
02 2.3132: Recharge batteries on during off-peak demand periods $1,311 - - $1,292
-
kW-mo/yr
$19 -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $67,127 $252,750 $76,769
1,508,206
kWh
$5,316
-
kW-mo/yr
$(-14,958.0) -
04 2.2511: Insulate bare equipment $1,671 $682 $2,078
40,739
kWh
- $(-407.0) -
05 2.3212: Optimize plant power factor $6,859 $12,500 - - $6,859 -
06 3.7196: Use re-usable filters $1,601 $697 - - - $1,601
TOTAL RECOMMENDED $79,782 $267,406 $80,355
1,578,546
kWh
$6,608
-
kW-mo/yr
$(-8,782.0) $1,601
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs