ITAC Assessment: MS0115
ITAC logo
ITAC Assessment: MS0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Non-Woven Fabrics
NAICS
n/a
SIC 2297: Non-woven Fabrics
Sales Range $5
M
to 10
M
# of Employees 46
Plant Area 43,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 5,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,034 1,472,157
kWh
Electricity Demand $31,157 3,495
kW-mo/yr
Electricity Fees $1,509 -
Natural Gas $64,211 19,403
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $522,311 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $520,010

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $130 $335 $128
3,810
kWh
- $2 - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $101 $384 $44
1,465
kWh
$55
-
kW-mo/yr
$2 - - - -
03 2.2437: Recover waste heat from equipment $2,226 $1,332 - - - $2,226
-
MMBtu
- - -
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $62,615 $4,720 - - - - $146
-
Tgal
$62,469
-
lb
-
05 3.5315: Lease / purchase baler; sell cardboard to recycler $75 - - - - - - $35
-
lb
$40
06 3.4155: Meter waste water $1,274 - - - - - - - $1,274
07 3.4155: Meter waste water $68 $25 - - - - - - $68
08 4.511: Expand operations into unused space $181,522 $600,000 - - - - - - $181,522
09 4.441: Install automatic packing equipment $274,300 $60,000 - - - - - - $274,300
TOTAL RECOMMENDED $522,311 $666,796 $172
5,275
kWh
$55
-
kW-mo/yr
$4 $2,226
-
MMBtu
$146
-
Tgal
$62,504
-
lb
$457,204
TOTAL IMPLEMENTED $520,010 $665,464 $172
5,275
kWh
$55
-
kW-mo/yr
$4 - $146
-
Tgal
$62,469
-
lb
$457,164
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs