ITAC Assessment: MS0105
ITAC logo
ITAC Assessment: MS0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Pants
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $50
M
to 100
M
# of Employees 119
Plant Area 60,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,089 588,804
kWh
Electricity Demand $17,064 3,600
kW-mo/yr
Electricity Fees $10,063 -
Natural Gas $66,366 11,150
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,961

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $16,334 $5,000 - - $16,334
-
MMBtu
- - -
02 2.7229: Air condition only space necessary $1,716 - - - $1,716
-
MMBtu
- - -
03 2.2153: Close off unneeded steam lines $176 - - - $176
-
MMBtu
- - -
04 2.7111: Reduce illumination to minimum necessary levels $1,134 - $608
23,154
kWh
$526
-
kW-mo/yr
- - - -
05 2.8114: Change rate schedules or other changes in utility service $2,285 - - $2,285
-
kW-mo/yr
- - - -
06 3.1162: Use less wasteful packaging $1,997 $34,896 - - - $(-12,000.0)
-
lb
- $13,997
07 4.522: Modify storage space to avoid rental of a warehouse $4,650 $5,000 - - - - $4,650 -
TOTAL RECOMMENDED $28,292 $44,896 $608
23,154
kWh
$2,811
-
kW-mo/yr
$18,226
-
MMBtu
$(-12,000.0)
-
lb
$4,650 $13,997
TOTAL IMPLEMENTED $9,961 $5,000 $608
23,154
kWh
$2,811
-
kW-mo/yr
$1,892
-
MMBtu
- $4,650 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs