ITAC Assessment: MS0104
ITAC logo
ITAC Assessment: MS0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Upholstered Chairs
NAICS
n/a
SIC 2522: Office Furniture, Except Wood
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 192,000
ft2
Annual Production 400,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,691 3,002,345
kWh
Electricity Demand $72,114 8,921
kW-mo/yr
Electricity Fees $3,007 -
Natural Gas $39,186 7,587
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $1,476 $54 $691
20,809
kWh
$785
-
kW-mo/yr
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $12,499 $3,080 $4,127
(-59,496)
kWh
$8,372
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $5,872 $12,115 - - $5,872
-
MMBtu
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $397 - $397
12,016
kWh
- - - -
05 3.5313: Increase amount of waste recovered for resale $3,224 $1,080 - - - $3,224
-
lb
-
06 4.652: Replace existing equipment with more suitable substitutes $13,962 $27,800 - - - - $13,962
TOTAL RECOMMENDED $37,430 $44,129 $5,215
(-26,671)
kWh
$9,157
-
kW-mo/yr
$5,872
-
MMBtu
$3,224
-
lb
$13,962
TOTAL IMPLEMENTED $21,707 $39,969 $1,088
32,825
kWh
$785
-
kW-mo/yr
$5,872
-
MMBtu
- $13,962
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs