Assessment Year | 1998 |
---|---|
Principal Product | Upholstered Chairs |
NAICS |
n/a
|
SIC | 2522: Office Furniture, Except Wood |
Sales Range | $50 M to 100M |
# of Employees | 210 |
Plant Area |
192,000
ft2
|
Annual Production | 400,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $108,691 | 3,002,345 |
kWh
|
$0.036 |
Electricity Demand | $72,114 | 8,921 |
kW-mo/yr
|
$8.08 |
Electricity Fees | $3,007 | - |
|
- |
Natural Gas | $39,186 | 7,587 |
MMBtu
|
$5.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,430 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,707 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,476 | $54 |
$691
20,809
kWh
|
$785
-
kW-mo/yr
|
- | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $12,499 | $3,080 |
$4,127
(-59,496)
kWh
|
$8,372
-
kW-mo/yr
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $5,872 | $12,115 | - | - |
$5,872
-
MMBtu
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $397 | - |
$397
12,016
kWh
|
- | - | - | - | |
05 | 3.5313: Increase amount of waste recovered for resale | $3,224 | $1,080 | - | - | - |
$3,224
-
lb
|
- | |
06 | 4.652: Replace existing equipment with more suitable substitutes | $13,962 | $27,800 | - | - | - | - | $13,962 | |
TOTAL RECOMMENDED | $37,430 | $44,129 |
$5,215
(-26,671)
kWh
|
$9,157
-
kW-mo/yr
|
$5,872
-
MMBtu
|
$3,224
-
lb
|
$13,962 | ||
TOTAL IMPLEMENTED | $21,707 | $39,969 |
$1,088
32,825
kWh
|
$785
-
kW-mo/yr
|
$5,872
-
MMBtu
|
- | $13,962 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs