ITAC Assessment: MS0085
ITAC logo
ITAC Assessment: MS0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product white bread and buns
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area 95,000
ft2
Annual Production 65,000,000
lb
Production Hrs. Annual 7,592
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,220 4,472,450
kWh
Electricity Demand $36,763 8,386
kW-mo/yr
Electricity Fees $127,914 -
Natural Gas $206,298 41,529
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,714 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $9,330 $5,625 - $9,330
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,033 $5,664 $714
67,116
kWh
$861
-
kW-mo/yr
$1,458 - - -
03 2.4221: Install compressor air intakes in coolest locations $1,313 $90 $326
30,481
kWh
$323
-
kW-mo/yr
$664 - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,271 $6,134 $420
39,566
kWh
- $851 - - -
05 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $20,680 $19,019 - - - $20,680
-
MMBtu
- -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $9,125 $6,500 - - - - - $9,125
07 3.6124: Burn waste oil for heat $8,264 $1,995 - - - $214
-
MMBtu
$8,050
-
gal
-
08 3.4155: Meter waste water $698 $665 - - - - - $698
TOTAL RECOMMENDED $53,714 $45,692 $1,460
137,163
kWh
$10,514
-
kW-mo/yr
$2,973 $20,894
-
MMBtu
$8,050
-
gal
$9,823
TOTAL IMPLEMENTED $19,768 $12,215 $326
30,481
kWh
$9,653
-
kW-mo/yr
$664 - - $9,125
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs