ITAC Assessment: MS0084
ITAC logo
ITAC Assessment: MS0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Poultry
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $1
M
to 5
M
# of Employees 150
Plant Area 31,000
ft2
Annual Production 20,625,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,030 4,288,101
kWh
Electricity Demand $98,061 12,834
kW-mo/yr
Electricity Fees $3,704 -
Natural Gas $91,581 24,960
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,815 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $6,500 $4,020 n/a - $6,500
-
MMBtu
- - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $7,888 $1,045 n/a - $7,888
-
MMBtu
- - -
03 2.7231: Use radiant heater for spot heating $7,391 $2,890 n/a - $7,391
-
MMBtu
- - -
04 2.2136: Install / repair insulation on steam lines $1,891 $982 n/a - $1,891
-
MMBtu
- - -
05 2.2437: Recover waste heat from equipment $26,730 $6,040 n/a - $26,730
-
MMBtu
- - -
06 2.7124: Make a practice of turning off lights when not needed $3,026 $2,316 n/a $3,026
99,941
kWh
- - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $24,600 $6,500 n/a - - $4,100
-
lb
- $20,500
08 3.4155: Meter waste water $2,434 $1,257 n/a - - - - $2,434
09 4.441: Install automatic packing equipment $12,355 $17,000 n/a - - - $12,355 -
TOTAL RECOMMENDED $92,815 $42,050 $3,026
99,941
kWh
$50,400
-
MMBtu
$4,100
-
lb
$12,355 $22,934
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs