Assessment Year | 1998 |
---|---|
Principal Product | Extruded/Molded PTFE |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 62 |
Plant Area |
58,250
ft2
|
Annual Production | 750
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $343,316 | 4,707,210 |
kWh
|
$0.073 |
Electricity Demand | $101,770 | 9,324 |
kW-mo/yr
|
$10.91 |
LPG | $157,121 | 28,849 |
MMBtu
|
$5.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $225,165 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,765 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1211: Move boiler to more efficient location | $64,705 | $204,550 |
$106,884
1,675,264
kWh
|
$30,457
-
kW-mo/yr
|
$(-72,636.0)
-
MMBtu
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $10,670 | $12,451 | - | - |
$10,670
-
MMBtu
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $4,293 | $12,457 |
$3,161
49,531
kWh
|
$1,132
-
kW-mo/yr
|
- | - | |
04 | 3.3131: Use evaporation to concentrate material | $1,405 | $453 | - |
$(-134.0)
-
kW-mo/yr
|
- |
$1,539
-
gal
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,508 | $23,028 |
$3,713
45,721
kWh
|
$795
-
kW-mo/yr
|
- | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $21,122 | $50,000 |
$33,165
519,637
kWh
|
- |
$(-12,043.0)
-
MMBtu
|
- | |
07 | 2.7135: Install occupancy sensors | $1,182 | $910 |
$1,182
18,464
kWh
|
- | - | - | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $117,280 | $1,000,000 |
$120,046
1,882,474
kWh
|
$40,991
-
kW-mo/yr
|
$(-43,757.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $225,165 | $1,303,849 |
$268,151
4,191,091
kWh
|
$73,241
-
kW-mo/yr
|
$(-117,766.0)
-
MMBtu
|
$1,539
-
gal
|
||
TOTAL IMPLEMENTED | $17,765 | $36,842 |
$4,895
64,185
kWh
|
$661
-
kW-mo/yr
|
$10,670
-
MMBtu
|
$1,539
-
gal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs