ITAC Assessment: MA0414
ITAC logo
ITAC Assessment: MA0414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Extruded/Molded PTFE
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 58,250
ft2
Annual Production 750
ton
Production Hrs. Annual 8,736
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $343,316 4,707,210
kWh
Electricity Demand $101,770 9,324
kW-mo/yr
LPG $157,121 28,849
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $225,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,765

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (haz) Savings
01 2.1211: Move boiler to more efficient location $64,705 $204,550 $106,884
1,675,264
kWh
$30,457
-
kW-mo/yr
$(-72,636.0)
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $10,670 $12,451 - - $10,670
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $4,293 $12,457 $3,161
49,531
kWh
$1,132
-
kW-mo/yr
- -
04 3.3131: Use evaporation to concentrate material $1,405 $453 - $(-134.0)
-
kW-mo/yr
- $1,539
-
gal
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,508 $23,028 $3,713
45,721
kWh
$795
-
kW-mo/yr
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $21,122 $50,000 $33,165
519,637
kWh
- $(-12,043.0)
-
MMBtu
-
07 2.7135: Install occupancy sensors $1,182 $910 $1,182
18,464
kWh
- - -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $117,280 $1,000,000 $120,046
1,882,474
kWh
$40,991
-
kW-mo/yr
$(-43,757.0)
-
MMBtu
-
TOTAL RECOMMENDED $225,165 $1,303,849 $268,151
4,191,091
kWh
$73,241
-
kW-mo/yr
$(-117,766.0)
-
MMBtu
$1,539
-
gal
TOTAL IMPLEMENTED $17,765 $36,842 $4,895
64,185
kWh
$661
-
kW-mo/yr
$10,670
-
MMBtu
$1,539
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs