ITAC Assessment: MS0066
ITAC logo
ITAC Assessment: MS0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Electric Tools
NAICS
n/a
SIC 2328:
Sales Range $50
M
to 100
M
# of Employees 126
Plant Area 74,548
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,215 1,643,904
kWh
Electricity Demand $13,425 4,456
kW-mo/yr
Electricity Fees $24,380 -
Natural Gas $2,605 540
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,311 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,273

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.2437: Recover waste heat from equipment $1,416 $1,049 - - - $1,416
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,005 $18,850 $6,374
133,646
kWh
$1,043
-
kW-mo/yr
$1,588 - -
03 2.7124: Make a practice of turning off lights when not needed $2,427 - $1,897
43,083
kWh
$26
-
kW-mo/yr
$504 - -
04 2.7229: Air condition only space necessary $4,606 $282 $3,930
82,356
kWh
- $676 - -
05 3.3131: Use evaporation to concentrate material $3,857 $10,000 - - - - $3,857
-
gal
TOTAL RECOMMENDED $21,311 $30,181 $12,201
259,085
kWh
$1,069
-
kW-mo/yr
$2,768 $1,416
-
MMBtu
$3,857
-
gal
TOTAL IMPLEMENTED $5,273 $11,049 - - - $1,416
-
MMBtu
$3,857
-
gal